Explore our case studies to see how we’ve delivered exceptional results across a range of projects. From concept to completion, our dedication to quality and craftsmanship shines through in every detail.
Our Success Stories
Take a closer look at some of our completed projects, showcasing the skill, care, and expertise we bring to every job. These case studies highlight our commitment to delivering outstanding results tailored to our clients' needs.
One of the main reasons we were awarded this project was our understanding of the clients requirements to maintain the operation of the commercial units at ground floor level whist the works to the upper Levels were carried out.
Project Value
Project Duration
This was a much needed facility for the hospital as there was no accessibility toilet at the time, the ambulant user toilet would facilitate the users of the hospital café which prior to the construction meant having to use the WC facilities in the main hospital building which was far from ideal for them.
Project Value
Project Duration
The design brief by the school was to improve main entrance access and security as the original access was poorly designed which meant that visitors and parents were often found roaming the school grounds trying to find the main entrance.
This also posed a security problem for the school. The reception area was also very small which meant parents and children waiting outside to sign in.
Project Value
Project Duration
One of the main purposes of the scheme was to provide our client with access to all areas of the property, to achieve this all the existing door openings were widened, and any steps were removed to provide level thresholds, a ceiling mounted tack hoist was installed to provide access from bathroom to the bedroom.
Project Value
Project Duration
The purpose of this scheme was to provide special needs facilities for a young boy. The single storey extension to a bungalow consisted of a new bedroom with level access threshold to provide easy access to the decking and garden areas.
Project Value
Project Duration
Our remit was to strip out and renew the existing finishes whilst maintaining many of the original features such as the cornices, skirting and mouldings.
Project Value
Project Duration
This grade ll listed Victorian terrace in Islington was in a prime location for further development so by adding a further bedroom with bathroom would not only increase the value but further enhance this property.
Project Value
Project Duration
Our remit was to strip out and renew the existing finishes whilst maintaining many of the original features such as the cornices, skirting and mouldings.
Project Value
Project Duration
This grade ll listed Victorian terrace in Islington was in a prime location for further development so by adding a further bedroom with bathroom would not only increase the value but further enhance this property.
Project Value
Project Duration
Just like many other schools in the London area this school was struggling with over-crowding so had to find more space for additional class rooms.
Project Value
Project Duration
This office building located in the hearth of central London has been owned by it’s current proprietor for the past 30 years, it had been previously let to an well know employment agency for the past 25 years, once the building became vacant the owners decided it was time for a revamp.
Project Value
Project Duration
If you're looking for a trusted and experienced construction partner, look no further than Abbey Builders.
For more information, advice, or to discuss your next project, contact us below.